Solar Water Heater Programme — Mass Residential Rollout
Theme: Demand-side energy management
Reform at a glance
- What changes
- Solar Water Heater Programme — Mass Residential Rollout
- Responsible actor (recorded)
- Department of Electricity and Energy / Eskom / COGTA
- Recorded status
- Stalled — editorial assessment.
- Milestone described by this status
- Status scope has not yet been independently documented; it may cover only part of this reform.
- Next documented milestone
- Next milestone not yet documented
On the record
Raised in 3 committee meetings, Sept 2024. Full record
Each dot is one event; events in the same month stack. Dots link to their source. Coverage is incomplete: an idea can have been discussed in meetings not yet linked here.
On this page
Description
AI draft, partly checkedThis idea's text is AI-drafted. Some of its claims have been checked against sources and corrected; the rest has not. Treat its figures as unverified unless a linked source confirms them. How idea text is checked
Solar water heaters (SWH) reduce household electricity consumption by 30–40% by substituting electric geysers — one of the largest residential electricity loads. The DMRE's Solar Water Heater Programme (SWHP) has been running in various forms since 2008, targeting 1 million installations but achieving far fewer due to supply chain, installation quality, and financing constraints. The DMRE procured about 87,000 locally manufactured units (2015–2018) for installation through municipalities; EskomEskom: South Africa's national electricity utility and dominant power producer, transmitter, and distributor. Eskom's debt crisis and maintenance failures have been a primary cause of load shedding and a binding constraint on economic growth. terminated its solar water heater rebate programme in 2014, and by 2024 there was no manufacturing of new units pending a review of the programme. The programme targets low-income households (subsidised) and middle-income households (financed). The programme carried a 70% local-content requirement; damaged and stolen units and mounting storage costs plagued delivery.
Assessment
Ratings: AI-assigned, not reviewed. How they were made
Responsible: Department of Electricity and Energy / Eskom / COGTA
Feasibility Assessment
Medium-high: Programme model proven; ESCO financing addresses upfront cost barrier. Scale requires municipal procurement capacity and SABS-certified supply chain at volume.
AI-drafted. Its figures, dates, laws and named bodies have been checked against sources; its judgements have not been checked.
Where the numbers stand
All indicators →- Eskom Energy Availability Factor72%2025
+7 pp from 65% in 2020. Eskom Integrated Reports (Eskom IR)
- Load Shedding (Electricity Shed)0 GWh2025
−1798 GWh from 1798 GWh in 2020. CSIR / Eskom (CSIR Energy)
Next official read on this: Electricity generated and available for distribution, October 2026 — due 3 December 2026 (Stats SA schedule).
Series tagged to this idea’s binding constraint. Each value is the latest observation held here and can lag the official release.
Published estimates
Figures published by the institutions named, not SA Policy Space projections. They measure different things over different periods and are not added up.
What the tags mean
- Ex-post estimate
- Estimated from data on what already happened, such as an evaluation of a past policy.
- Model projection
- A forecast or scenario from a model or a costed plan. Not an observed outcome.
- Rough calculation
- A simple calculation the source shows, such as a volume times a price.
- Claim, no method
- Stated by an official or interested party without a named study, model or method.
- Official figure
- An allocation, count or balance from budget, audit or programme records. Not an estimate of effect.
The tags were assigned by three AI models reading each estimate independently; no review of them by a person is recorded. The figure, its source and its caveat are the publisher’s.
On the problem it addresses: Energy
These measure the cost of the whole constraint. They are not estimates of what this reform would gain.
Cost of the problem
Ex-post estimateSARB models estimate that load-shedding reduced 2022 GDP growth by between 0.7 and 3.2 percentage points (other institutions' estimates range from 0.4 to 4.2 points).
Cost of the electricity constraint that the energy reforms target (ERA Act, self-generation, Eskom restructuring, IRP, transmission); a cost of the constraint, not a modelled benefit of any reform.
An Occasional Bulletin of Economic Notes: 'The views expressed ... are those of the author(s) and should not be attributed to the South African Reserve Bank or South African Reserve Bank policy.' The low end (0.7, SARB Model 1, direct sectoral effect, the figure SARB's April 2023 Monetary Policy Review also cites: 'load-shedding alone shaved off 0.7 percentage points from growth in 2022') and the high end (3.2, dynamic CGE with indirect effects) differ mainly on indirect effects; private estimates in the same note range from 0.2-0.4 (Investec, after backup power) to 3.5-4.2 (PwC), and Section 5.2 of the note gives a different SARB range (-1.2 to -3.0) that the note does not reconcile.
Cost of the problem
Ex-post estimateA SARB Quarterly Bulletin box estimated that load-shedding likely lowered quarterly (not annualised) real GDP growth in the third quarter of 2022 by 2.1 percentage points (unadjusted intensity index), or 2.3 points with the adjusted index.
Cost of the electricity constraint (same reforms as above); a single quarter.
The box says 'the results are merely indicative and should be interpreted as such' and the estimated frameworks 'are not exhaustive' (no control for changes in electricity demand). A regression of quarterly GDP growth on a load-shedding intensity index (about 0.0014 percentage points per GWh shed, adjusted index); one quarter only, and not comparable with the annual figures.
Cost of the problem
Model projectionThe SARB's MPC estimated in January 2023 that load-shedding deducts as much as 2 percentage points from growth in 2023, compared with a previous estimate of 0.6 percentage points.
Cost of the electricity constraint (energy reforms in this package).
A forecast assumption, not an outturn; the January 2024 MPC statement notes 'The cost per stage was revised lower in the March 2023 MPC meeting', and the OECD later reports 1.5 points for 2023.
Cost of the problem
Model projectionThe OECD reports that electricity shortages were estimated to reduce GDP growth by 1.5 percentage points in 2023, 0.5 points in 2024 and 0.2 points for 2025, citing the SARB (2024).
Cost of the electricity constraint (energy reforms in this package).
OECD (citing SARB, 2024) (2025): OECD Economic Surveys: South Africa 2025
Secondary citation: the OECD's Ecoscope blog attributes this to SARB's October 2024 Monetary Policy Review, but that MPR (fetched) gives no 2023 figure and reports April 2024 projections of '0.6, 0.2 and 0.04 percentage point deductions' and only 0.1 point for 2024, so the 2024-25 figures here disagree with SARB's own later numbers.
Cost of the problem
Model projectionSARB's January 2024 MPC statement put the nominal cost to GDP of load-shedding at R0-R1.2 million per stage-day for stages 1 and 2 and up to R204-R899 million for stages 3 to 6, when continued on a 24-hour basis on weekdays.
Cost of the electricity constraint (energy reforms in this package).
A forecasting input ('the cost to GDP per stage-day'), revised lower in March 2023 and 'assessed further as new data and information is received'; the SARB OBEN note cites Intellidex at about R125 million per stage per day on average.
Who is on record
Every position on this reform: whose word it is, when it was said, and any terms attached.
Backers
1
1 actor on record
Conditional
0
0 actors on record
Opposition
0
0 actors on record
The counts above and the score include the 1 stance on record in the actor's own words. Shown below and not counted: 1 MP's remark in committee, 2 with no statement on record.
Coalition Read
1 of 4 stances on record · none checked
A coalition score needs at least 3 stances on record in the actor's own words. The stances below are the evidence; the average over this few of them would not be.
Anchor: Department of Mineral and Petroleum Resources (DMPR). Each is the actor in its camp with the highest influence estimate, which is AI-drafted and not reviewed.
Political Tractability
No reviewed signals · 0% of mapped influence has been reviewed.
Organisations on record (1)
In the organisation's own words: a public statement or its representative in committee.
The DMRE Director-General said there was ministerial direction and interest to take the solar water heater programme forward, though it remained a work in progress.
“Mr Mbele said there was direction and interest from the Minister to take the programme forward. At this stage, it was still a work in progress.” Mr Jacob Mbele, Director-General, DMRE. Energy, 2024-09-18
“This was a programme that needed to be continued for impoverished households, where the government would be playing a bigger role.” Mr Jacob Mbele, Director-General, DMRE. Energy, 2024-09-18
“Minister Mantashe told the Committee that the NSWHP was one of the most defective programmes the DMRE has inherited. However, efforts are in place to correct many of the challenges.” Mr Gwede Mantashe, Minister of Mineral Resources and Energy. Mineral Resources, 2023-05-30
All 5 statements, by speaker and date
Mr Tseliso Maqubela, DDG: Minerals and Petroleum Regulation, DMRE
- 2022-02-15, support: “The DMRE was disappointed about the slow pace of the Solar Water Heater (SWH) programme - also referred to as Solar Geysers. However, it was confident that this matter would turn around, as it had implemented a plan on this – including a change of personnel, which would be expanded on in the presentation.”
Minister Gwede Mantashe
- 2022-09-20, support: “Concerning the political will to implement the solar heater project, the Minister stated that when he had come to the Department, he had made it clear to the Committee that it was one of the worst projects he had ever seen. However, he was making every effort to make it work.”
Mr Gwede Mantashe, Minister of Mineral Resources and Energy
- 2023-05-30, support: “Minister Mantashe told the Committee that the NSWHP was one of the most defective programmes the DMRE has inherited. However, efforts are in place to correct many of the challenges.”
Mr Jacob Mbele, Director-General, DMRE
- 2024-09-18, support: “Mr Mbele said there was direction and interest from the Minister to take the programme forward. At this stage, it was still a work in progress.”
- 2024-09-18, support: “This was a programme that needed to be continued for impoverished households, where the government would be playing a bigger role.”
Interests and concerns (AI-drafted profile)
Interest: Mining and petroleum regulation. The Minister of Mineral and Petroleum Resources administers the Mineral and Petroleum Resources Development Act, the…
Concern: Not recorded.
Engagement path: Not recorded.
MPs' remarks in committee (1)
A party member speaking in committee, not the party. Counted in no score.
An ANC member called the solar water heater programme a very good programme while asking about maintenance responsibility.
“Who would be responsible for the maintenance and repair of the solar water heaters after they had been installed? This was a very good programme.” Mr V Nkosi (ANC), speaking as a member. Energy, 2024-09-18
“Ms F Hassan (ANC) said this was one project that needed to work.” Ms F Hassan (ANC), speaking as a member. Energy, 2024-09-18
Interests and concerns (AI-drafted profile)
Interest: Full implementation of the National Health Insurance Act and the BELA Act, private sector participation in rail and port operations, a competitive ele…
Concern: Not recorded beyond the dated statements linked on its positions.
Engagement path: Not recorded.
No statement on record (2)
AI-drafted from the actor's profile. Counted in no score.
No statement on this reform in the committee minutes on file. The position is AI-drafted from the actor's profile.
Interests and concerns (AI-drafted profile)
Interest: Managing R400bn+ debt restructuring with government support; maintaining grid stability during the unbundling transition; preserving technical and ins…
Concern: Unbundling of the distribution arm (EDI) could fragment operational coherence and create regulatory gaps; transmission entity capitalisation requires…
Engagement path: Credible debt restructuring plan with government guarantees; adequate transition period for unbundling with clear milestones; grid investment ring-fen…
No statement on this reform in the committee minutes on file. The position is AI-drafted from the actor's profile.
Interests and concerns (AI-drafted profile)
Interest: Fiscal consolidation with public debt stabilising below 75% of GDP; structural reforms that improve revenue without expanding contingent liabilities;…
Concern: Unfunded mandates in energy transition (JETP co-financing); Eskom's R400bn+ debt and how restructuring socialises costs; reform proposals that create…
Engagement path: Reforms must be fiscally neutral or revenue-positive over the MTEF window; SOE restructuring must demonstrably reduce contingent liabilities; credible…
Referenced in OECD Economic Surveys: South Africa
OECD SA Survey (2020, 2025). The 2020 survey dedicated a section to water management; agricultural water prices flagged as too low.
What is at stake
The Auditor-General reported that the Department of Mineral Resources and Energy had paid suppliers a total of R310 075 097 in storage costs on its solar water heating programme as at 31 March 2022, and notified it as a material irregularity (AGSA, 2022).
SourceThe scale of wasteful expenditure and the complete failure to achieve the objectives of this programme is unacceptable. — Nonkosi Mvana, Chairperson of the Portfolio Committee on Electricity and Energy, Parliament media statement on the Solar Water Heater Programme, 16 March 2025
Source
Implementation Roadmap
The national solar water heater programme has been largely stalled for several years. Eskom stopped processing rebates for systems installed after 31 January 2015 and handed the programme to the then Department of Energy; about 87,000 locally made units were later manufactured but not installed, and in March 2025 the department reported R324.8 million of fruitless and wasteful storage expenditure, litigation to recover 13,429 units held by suppliers, and 6,123 faulty units. The Deputy Minister said the department would assess the programme's viability, and a draft concept paper for an NSWH Programme 2.0 was being developed for implementation in 2027/28. The main obstacle is delivery capacity rather than policy or law. The next step would be to close out the first programme and publish the 2.0 design, with any rebate or service-company model costed and procured through ordinary budget and procurement processes.
DoneEskom handed administration of its solar water heater rebate to the Department of Energy and said it would process rebate claims only for equipment installed on or before 31 January 2015.
Source: justmoney.co.za
DoneAbout 87,000 water heaters had been manufactured for the departmental programme but the installation phase never started, and the programme's 2018/19 budget was reported as R0, down from R394 million the previous year.
Source: citizen.co.za
DoneThe department told the Portfolio Committee on Electricity and Energy that the programme had incurred R324.8 million in fruitless and wasteful storage expenditure, that it was litigating to recover 13,429 units held by suppliers, that 6,123 units were faulty, that the Central Energy Fund had withdrawn as implementing agent, and that a draft concept paper for NSWH Programme 2.0 targeted implementation in 2027/28.
Source: sundaytribune.co.za
ProposedClose out the first programme: conclude the recovery litigation, install or dispose of recoverable units, and publish an account of the storage losses and the consequence management taken.
ProposedPublish the viability assessment and the NSWH Programme 2.0 concept for public comment, including whether delivery should use energy service companies, a rebate for middle-income households, or direct installation for low-income households.
ProposedFund the chosen model only once it has a published costing, and procure it under ordinary public procurement rules.
ProposedStrengthen enforcement of the existing building regulation requiring at least half of hot water in new buildings to be heated by means other than electrical resistance heating.
No new primary legislation identified. Existing instrument: National Building Regulations, regulation XA2 (applied through SANS 10400-XA), which requires at least 50% of the annual average hot water heating requirement to be provided by means other than electrical resistance heating. Any new programme would be authorised through the departmental budget vote and procured under public procurement law.
Deputy Minister Samantha Graham-Maré told the Portfolio Committee on Electricity and Energy in March 2025 that the storage costs should never have happened and that the programme was not one the department presented with any pride; committee member Mogamad Paulson warned that the matter must not disappear silently. In May 2025 a committee member asked the Minister of Electricity and Energy whether local manufacturers had been engaged for NSWH 2.0. In our judgement, the main political risk is loss of credibility from the first programme rather than opposition to the idea itself.
Evidence & Research
No linked research evidence yet. Coverage is incomplete.
Policy documents
No linked official-document evidence yet. Coverage is incomplete.
Parliamentary record
3 meetingsCommittee sittings this reform was drawn from, most recent first. Each row opens the meeting on this site; the PMG link goes to the source record.
Energy
18 September 2024Solar Water Heater Programme; AGSA Mandate & DMRE Portfolio Audit Outcomes; with Deputy Minister
Energy
11 September 2024NERSA’s Municipal Tariff Review Process; with Minister
Energy
4 September 2024Nuclear New Build programme; Update on the Koeberg Nuclear Power Plant Long Term Operation
Get the Monday briefing by email
— A short weekly digest of what moved in SA policy.How to cite
SA Policy Space (n.d.). Solar Water Heater Programme — Mass Residential Rollout. SA Policy Space. https://sa-policy-space.vercel.app/ideas/solar-water-heater-programme-mass-residential-rollout Live page. Data version: 2026-11-26.661ff631; data as of: 2026-11-26.
Status History
tracked since Mar 2026- Recorded as Stalled when status tracking began — held since at least Mar 2026.Mar 2026
Data as of 2026-11-26 · latest PMG meeting 2026-11-20