210 links over all 171 ideas, read three ways: as a map, as an implementation order, and as a ranking of the reforms that unblock the most. Sequencing uses 204 of those links — the 6 tension edges are drawn on the map but do not set wave order.
208 of the 210 links were drafted by an AI model and have not been checked; 2 cite a source. Read the map, the order and the ranking as hypotheses about how reforms connect, not as findings.
An implementation order read off the dependency graph. Reforms are grouped into waves: groups that can proceed in parallel once their predecessors are complete. The critical path is the longest sequential chain; bottlenecks are the reforms with the most unfinished work downstream of them. Almost all the links are AI-drafted, so treat the order as experimental.
Based on 171 reforms · 204 sequencing edges · 8 waves · critical path 7 steps long. The Map tab counts every link, including tension edges that do not set this order.
171
Total Reforms
8
Waves
7
Critical Path Length
10
Bottleneck Reforms
Wave 1★ critical
86 reforms · 5 already implemented
Wave 2★ critical
22 reforms · 2 already implemented
Wave 3★ critical
8 reforms
Wave 4★ critical
4 reforms
Wave 5★ critical
3 reforms
Wave 6★ critical
3 reforms
Wave 7★ critical
1 reform
Wave 8· loops
44 reforms · 1 already implemented
Parked here because the graph loops — not a later implementation stage.
Longest sequential dependency chain — 7 steps. Delays anywhere along this chain delay all subsequent reforms.
The reforms with the most unfinished work downstream of them, by the same leverage score as the Bottlenecks view. An implemented reform has none left to unblock, so it is not listed.
| # | Reform | Downstream |
|---|---|---|
| 1 | 43 reforms | |
| 2 | 43 reforms | |
| 3 | 43 reforms | |
| 4 | 43 reforms | |
| 5 | 44 reforms | |
| 6 | 46 reforms | |
| 7 | 43 reforms | |
| 8 | 43 reforms | |
| 9 | 43 reforms | |
| 10 | 45 reforms |
These reforms have circular dependencies — Fiscal Consolidation is one of them — and have been placed at the end of the wave sequence. That last wave is a holding pen, not a later implementation stage. They are marked with a “cycle” badge and excluded from the critical path calculation.
| Package | W1 | W2 | W3 | W4 | W5 | W6 | W7 | W8 | Total |
|---|---|---|---|---|---|---|---|---|---|
| Infrastructure Unblock | 28 | 8 | 1 | — | — | — | — | 14 | 51 |
| SMME & Employment | 11 | 3 | 1 | 1 | 1 | — | 1 | 8 | 26 |
| Human Capital | 12 | 4 | 3 | 1 | — | — | — | 10 | 30 |
| Trade & Industrial | 9 | 2 | 1 | — | 1 | 1 | — | 10 | 24 |
| State Capacity | 26 | 5 | 2 | 2 | 1 | 2 | — | 2 | 40 |