IMT Spectrum Auction Completion (ICASA)
Allocate high-demand mobile spectrum through an ICASA auction.
Loading ideas…
Reform records with linked evidence. The growth-impact and feasibility ratings were assigned by an AI model and have not been reviewed by a person.
Idea descriptions are AI-drafted and being checked against sources; each card says how far. What the labels mean · Corrections
4 ideas · sorted by Combined Score
Allocate high-demand mobile spectrum through an ICASA auction.
Raised 4× in committee
Update the electricity resource plan to guide the generation mix and future procurement.
Raised 3× in committee
Koeberg Nuclear Power Station near Cape Town contributes approximately 1,800 MW to South Africa's grid — roughly 4–5% of national capacity — and is the only nuclear plant on the African continent. Eskom applied to the National Nuclear Regulator (NNR) for a 20-year life extension beyond the original 2024 (Unit 1) and 2025 (Unit 2) licence end dates. Unit 1's life extension was approved following steam generator replacement (a major technical milestone completed in 2023–24). Unit 2's 20-year life extension was approved by the NNR in November 2025, allowing operation until 9 November 2045. Koeberg's continued operation is significant for Western Cape grid stability, providing reliable baseload generation that wind and solar cannot replicate without storage. The life extension, costed by Eskom at about R21 billion, defers decommissioning and preserves 1,800 MW of zero-carbon baseload capacity. Both units now operate under extended licences: Unit 1 to 2044 and Unit 2 to 2045, after Unit 2's steam generator replacement was completed and it returned to service in December 2024.
Raised 3× in committee
The Energy Bounce-Back Loan Guarantee Scheme and related self-generation incentives enable businesses to install rooftop solar, battery storage, and gas backup capacity with government-backed financing and accelerated depreciation allowances. Introduced in the 2023 Budget as a R9 billion tax incentive programme and expanded under Operation Vulindlela Phase I, the policy shifts generation responsibility partly to the private sector while Eskom's grid is stabilised. Firms that install renewable capacity reduce their dependence on load-shedding schedules, cutting downtime costs estimated at R20 billion per month across the economy. The scheme is administered through the commercial banking sector under SARB oversight and links to the December 2022 amendment of Schedule 2 of the Electricity Regulation Act, which removed the licensing threshold for embedded generation. The loan guarantee is aimed at households and small and medium businesses (turnover of R300 million or less). The loan guarantee scheme ran from 8 August 2023 to August 2024, so 'implemented' here means the scheme was delivered and has closed.