Construction site extortion and business protection rackets have become a major barrier to infrastructure delivery, with the construction mafia disrupting projects worth billions of rands. The committee heard that over 80% of major construction sites in KwaZulu-Natal and Gauteng face extortion demands. Dedicated anti-extortion units, established in some provinces, have had mixed results due to the intersection of organised crime with local political structures. The committee has called for inter-departmental coordination between SAPS, NPA, and DTIC to protect infrastructure investment.
Only three of South Africa's nine provincial health departments (Free State, Mpumalanga and Western Cape) achieved clean audits from the Auditor-General in 2023/24, reflecting persistent failures in financial management, supply chain governance, and infrastructure maintenance. The cumulative effect—medicine stockouts, equipment breakdowns, staff non-payment, and facility collapse—falls disproportionately on the 84% of South Africans dependent on public health. The Provincial Health Department Turnaround Programme (modelled on National Treasury's Municipal Finance Improvement Programme for local government) deploys specialist financial management, supply chain, and HR teams to the three worst-performing provinces (Eastern Cape, Limpopo, North West) with a 2-year intensive support mandate. The PC on Health BRRRs 2022–2024 document the cyclical nature of provincial health crises; Limpopo's health department was placed under Section 100 in December 2011. NHI implementation requires a stable provincial health infrastructure as its foundation—without turnaround, NHI will formalise dysfunction rather than reform it.
South Africa's State-Owned Enterprises operate under a regulatory environment—the Public Finance Management Act (PFMA), BBBEE procurement requirements, the National Treasury Regulations, and Ministerial directives—that creates structural impediments to operational efficiency and private participation. Specific reform targets include: revising Section 54 of the PFMA to reduce ministerial pre-approval requirements for commercial transactions (which delays Eskom, Transnet, and other SOE deals by months), clarifying BBBEE scorecard treatment for SOE-private joint ventures (a barrier to private sector participation in Transnet and PRASA concessions), and harmonising the Public Procurement Act (2024) with SOE-specific procurement needs. The Presidential SOE Council, chaired by the President, coordinates governance reform across the 10 major commercial SOEs. The MTBPS 2025 notes that SOE transfer payments have declined from R40 billion to R28 billion annually as restructuring conditions tighten. The textbook (Chapter 3) identifies the statutory board model (Singapore's statutory authorities) as the structural reform that could fundamentally change SOE governance dynamics.
National Treasury's PPP Unit administers South Africa's public-private partnership framework under Treasury Regulation 16, which requires extensive feasibility studies, value-for-money assessments, and multi-stage National Treasury approval. While this oversight protects public finances, the process has been criticised as too slow and costly — particularly for smaller social infrastructure PPPs covering schools, health centres, and correctional facilities — with fewer than 40 PPP agreements reaching financial close since 2000. The amended Treasury Regulation 16, effective from 1 June 2025, created a simplified approval pathway for PPPs below R2 billion; DPWI and National Treasury are reviewing an off-balance-sheet framework for municipal-level PPPs and better alignment with the Infrastructure Fund's blended finance model established in 2020.
South Africa's system of intergovernmental fiscal transfers—governed by the Division of Revenue Act (DoRA), the Intergovernmental Fiscal Relations Act (1997), and the equitable share formula—distributes approximately R900 billion annually between national, provincial, and local government. The equitable share formula for provinces (the largest transfer, R633.2 billion in 2025/26) has been under review since 2015, with only incremental changes such as the health risk-adjusted index (2010, redesigned in the 2022 MTEF), and its components—education (weighted by learner numbers), health (weighted by population and poverty), a basic (population) share, and smaller poverty, economic activity and institutional components—no longer align with provincial fiscal needs or service delivery capacity. Key reform proposals from the FFC (Financial and Fiscal Commission): revising the health component to align with actual provincial disease burden (KZN and EC are undercompensated relative to their TB/HIV burden), introducing a conditional infrastructure maintenance grant (ring-fenced from the provincial equitable share to prevent maintenance budget raiding), and strengthening the local government equitable share to reflect the growing service delivery obligations of municipalities. In the 2026 Budget Review, National Treasury said it continues to review the provincial equitable share formula with provincial treasuries, national departments and Statistics South Africa.
South Africa spends approximately R280 billion annually on social grants (2025/26), including the Social Relief of Distress (SRD) grant (R370 per month for about 8.3 million recipients), child support grants (R560 per month for 13 million children), old age pensions, and disability grants. The fiscal cost of the SRD grant alone—introduced as a COVID-19 measure in 2020 and retained due to mass unemployment—is R35 billion per year. The Inclusive Growth Spending Review, proposed in the 2024 Budget and commissioned within the Medium-Term Expenditure Framework process, evaluates whether the social protection budget is optimally structured to simultaneously reduce poverty (short-term) and unemployment (long-term). Specifically: could a portion of the SRD grant budget be redirected to employment programmes (EPWP, Jobs Fund) without leaving vulnerable people worse off? The evidence from international social protection research suggests that conditionality (linking grants to training or job search) works in countries with functioning labour markets but has negligible effects in high-unemployment contexts. The textbook (Chapter 8) notes that South Africa's grant system is fiscally large, well-targeted, and poverty-reducing but has no direct channel to labour market activation. The MTBPS 2025 extended the SRD grant by 14 months to March 2027.
South Africa's public infrastructure — schools, hospitals, courts, police stations, and government offices — suffers chronic underfunding of maintenance; the Minister of Public Works and Infrastructure put the maintenance backlog at approximately R30 billion in August 2025, calculated on only the 56,000 of the roughly 81,000 properties on DPWI's Immovable Asset Register for which the Department receives user charges. When capital budgets are under pressure, departments routinely cut maintenance first, accelerating deterioration of state assets. National Treasury and DPWI are developing a Maintenance Delivery Improvement Programme that would ring-fence a minimum maintenance allocation (proposed at 1-1.5% of asset replacement value per year) in departmental budgets, enforce it through conditional grant conditions, and track compliance through infrastructure condition indices. The Government Immovable Asset Management Act (GIAMA) provides the statutory basis for asset condition reporting but enforcement has been weak.
The Road Accident Fund (RAF), a statutory insurer that compensates people injured in road accidents, and the dependants of people killed in them, where another driver's negligence caused the crash, had net liabilities of R345 billion, 5.5% of GDP, according to the IMF's Fiscal Transparency Evaluation (reported April 2024). The RAF is structurally insolvent: revenue of R47.8 billion in 2025/26 covers only current claims. The Road Accident Benefit Scheme (RABS) Bill, first proposed in 2014, would replace this fault-based system with a no-fault social insurance model (fixed benefit schedules, income replacement for injured workers, functional rehabilitation rather than lump-sum damages). The National Assembly rejected the RABS Bill in 2020; the Department of Transport briefed the Portfolio Committee on Transport on reintroducing it in June 2025. The reform eliminates legal costs, which the RAF put at R10.6 billion in one year, redirecting them to claimant benefits. The PC on Transport BRRRs 2021–2024 have unanimously recommended RAF structural reform for a decade, noting that the legal profession's opposition is the primary political obstacle. National Treasury's fiscal risk register classifies RAF as the highest-risk contingent liability.