Gas Bill — LNG Import Infrastructure and City Gas

EnergyUnder reviewMedium TermAI draft, partly checkedRaised 3× in committeeMineral Resources and Energy

Theme: Gas sector development

First raisedFeb 2022Last discussedAug 2023No committee discussion in 12+ months3 meetings on the record ↓

Reform at a glance

What changes
Gas Bill — LNG Import Infrastructure and City Gas
Responsible actor (recorded)
Department of Electricity and Energy / NERSA / Transnet / National Ports Authority
Recorded status
Under review — editorial assessment.
Milestone described by this status
Status scope has not yet been independently documented; it may cover only part of this reform.
Next documented milestone
Next milestone not yet documented
Compare shortlist (0/3)
Watch list (0)
Back to ideas

On the record

Raised in 3 committee meetings, Feb 2022 to Aug 2023. Full record

2013201520172019202120232025Committee meetings · 315 February 2022: Mineral Resources: DMRE Quarter 1, 2 & 3 2020/21 Performance & Implementation of Audit Improvement Plans; with Minister and Deputy Minister13 October 2022: Mineral Resources: Briefing on 2021/2022 Annual Report: NECSA, CEF, CGS, SANEDI, NNR and NRWDI23 August 2023: Mineral Resources: UPRD Bill: outstanding mattersCalls for comment · 329 October 2013: Call for comment: Proposed Levy on the Piped-Gas and Petroleum Pipeline Industries for 2014/1525 June 2021: Call for comment: Gas Amendment Bill16 July 2026: Call for comment: Gas BillStatus changes · 117 October 2026: Status moved from Partially implemented to Under review

Each dot is one event; events in the same month stack. Dots link to their source. Coverage is incomplete: an idea can have been discussed in meetings not yet linked here.

On this page

Description

AI draft, partly checkedThis idea's text is AI-drafted. Some of its claims have been checked against sources and corrected; the rest has not. Treat its figures as unverified unless a linked source confirms them. How idea text is checked

The Gas Bill [B6-2026], which would repeal and replace the Gas Act, 2001, would license the construction and operation of regasification facilities (including floating units in territorial waters or a port), require registration to import gas, and let licensed distributors lay pipes along streets with municipal approval. South Africa does not yet have an LNG import terminal: the first, the Zululand Energy Terminal at Richards Bay, has deferred its final investment decision to 2028, and the country lacks a permanent LNG import infrastructure framework. The Coega LNG terminal in the Eastern Cape and a Richards Bay permanent facility are in various stages of development. Gas plays a transition role as a dispatchable complement to intermittent renewables, and as feedstock for industrial processes currently dependent on Sasol's gas network. The Bill also covers delivery of gas without pipelines, through compression equipment and mobile storage units. As of August 2026, the Bill was still before the Portfolio Committee on Electricity and Energy, which concluded public hearings on 12 August 2026.

Assessment

Growth Impact4/5
Feasibility3/5

Ratings: AI-assigned, not reviewed. How they were made

Responsible: Department of Electricity and Energy / NERSA / Transnet / National Ports Authority

Feasibility Assessment

Medium: the Gas Bill [B6-2026] is in committee hearings (August 2026), not yet law. Once passed, implementation requires LNG terminal investment decisions and NERSA tariff methodology. GIPPP procurement can proceed. Supply diversification reduces Sasol dependence.

AI-drafted. Its figures, dates, laws and named bodies have been checked against sources; its judgements have not been checked.

Where the numbers stand

All indicators →
  • Eskom Energy Availability Factor72%2025

    +7 pp from 65% in 2020. Eskom Integrated Reports (Eskom IR)

  • Load Shedding (Electricity Shed)0 GWh2025

    −1798 GWh from 1798 GWh in 2020. CSIR / Eskom (CSIR Energy)

Next official read on this: Electricity generated and available for distribution, October 2026 — due 3 December 2026 (Stats SA schedule).

Series tagged to this idea’s binding constraint. Each value is the latest observation held here and can lag the official release.

Published estimates

Figures published by the institutions named, not SA Policy Space projections. They measure different things over different periods and are not added up.

What the tags mean
Ex-post estimate
Estimated from data on what already happened, such as an evaluation of a past policy.
Model projection
A forecast or scenario from a model or a costed plan. Not an observed outcome.
Rough calculation
A simple calculation the source shows, such as a volume times a price.
Claim, no method
Stated by an official or interested party without a named study, model or method.
Official figure
An allocation, count or balance from budget, audit or programme records. Not an estimate of effect.

The tags were assigned by three AI models reading each estimate independently; no review of them by a person is recorded. The figure, its source and its caveat are the publisher’s.

On the problem it addresses: Energy

These measure the cost of the whole constraint. They are not estimates of what this reform would gain.

  • Cost of the problem

    Ex-post estimate

    SARB models estimate that load-shedding reduced 2022 GDP growth by between 0.7 and 3.2 percentage points (other institutions' estimates range from 0.4 to 4.2 points).

    Cost of the electricity constraint that the energy reforms target (ERA Act, self-generation, Eskom restructuring, IRP, transmission); a cost of the constraint, not a modelled benefit of any reform.

    South African Reserve Bank (Janse van Rensburg and Morema) (2023): Reflections on load-shedding and potential GDP (Occasional Bulletin of Economic Notes OBEN/23/01)

    An Occasional Bulletin of Economic Notes: 'The views expressed ... are those of the author(s) and should not be attributed to the South African Reserve Bank or South African Reserve Bank policy.' The low end (0.7, SARB Model 1, direct sectoral effect, the figure SARB's April 2023 Monetary Policy Review also cites: 'load-shedding alone shaved off 0.7 percentage points from growth in 2022') and the high end (3.2, dynamic CGE with indirect effects) differ mainly on indirect effects; private estimates in the same note range from 0.2-0.4 (Investec, after backup power) to 3.5-4.2 (PwC), and Section 5.2 of the note gives a different SARB range (-1.2 to -3.0) that the note does not reconcile.

  • Cost of the problem

    Ex-post estimate

    A SARB Quarterly Bulletin box estimated that load-shedding likely lowered quarterly (not annualised) real GDP growth in the third quarter of 2022 by 2.1 percentage points (unadjusted intensity index), or 2.3 points with the adjusted index.

    Cost of the electricity constraint (same reforms as above); a single quarter.

    South African Reserve Bank (2022): Quarterly Bulletin December 2022, Box 1: Measures of electricity load-shedding

    The box says 'the results are merely indicative and should be interpreted as such' and the estimated frameworks 'are not exhaustive' (no control for changes in electricity demand). A regression of quarterly GDP growth on a load-shedding intensity index (about 0.0014 percentage points per GWh shed, adjusted index); one quarter only, and not comparable with the annual figures.

  • Cost of the problem

    Model projection

    The SARB's MPC estimated in January 2023 that load-shedding deducts as much as 2 percentage points from growth in 2023, compared with a previous estimate of 0.6 percentage points.

    Cost of the electricity constraint (energy reforms in this package).

    South African Reserve Bank (Monetary Policy Committee) (2023): Statement of the Monetary Policy Committee, January 2023

    A forecast assumption, not an outturn; the January 2024 MPC statement notes 'The cost per stage was revised lower in the March 2023 MPC meeting', and the OECD later reports 1.5 points for 2023.

  • Cost of the problem

    Model projection

    The OECD reports that electricity shortages were estimated to reduce GDP growth by 1.5 percentage points in 2023, 0.5 points in 2024 and 0.2 points for 2025, citing the SARB (2024).

    Cost of the electricity constraint (energy reforms in this package).

    OECD (citing SARB, 2024) (2025): OECD Economic Surveys: South Africa 2025

    Secondary citation: the OECD's Ecoscope blog attributes this to SARB's October 2024 Monetary Policy Review, but that MPR (fetched) gives no 2023 figure and reports April 2024 projections of '0.6, 0.2 and 0.04 percentage point deductions' and only 0.1 point for 2024, so the 2024-25 figures here disagree with SARB's own later numbers.

  • Cost of the problem

    Model projection

    SARB's January 2024 MPC statement put the nominal cost to GDP of load-shedding at R0-R1.2 million per stage-day for stages 1 and 2 and up to R204-R899 million for stages 3 to 6, when continued on a 24-hour basis on weekdays.

    Cost of the electricity constraint (energy reforms in this package).

    South African Reserve Bank (Monetary Policy Committee) (2024): Statement of the Monetary Policy Committee, January 2024 (footnote 3)

    A forecasting input ('the cost to GDP per stage-day'), revised lower in March 2023 and 'assessed further as new data and information is received'; the SARB OBEN note cites Intellidex at about R125 million per stage per day on average.

All published estimates for this reform package

Who is on record

Every position on this reform: whose word it is, when it was said, and any terms attached.

Backers

1

1 actor on record

Conditional

0

0 actors on record

Opposition

0

0 actors on record

The counts above and the score include the 1 stance on record in the actor's own words. Shown below and not counted: 1 with no statement on record.

Coalition Read

1 of 2 stances on record · none checked

1 of 56 actors on record — not scored

A coalition score needs at least 3 stances on record in the actor's own words. The stances below are the evidence; the average over this few of them would not be.

Anchor: Department of Mineral and Petroleum Resources (DMPR). Each is the actor in its camp with the highest influence estimate, which is AI-drafted and not reviewed.

Political Tractability

—Needs reviewed signals

No reviewed signals · 0% of mapped influence has been reviewed.

Organisations on record (1)

In the organisation's own words: a public statement or its representative in committee.

Department of Mineral and Petroleum Resources (DMPR)SupportFrom the minutes · AI-read2022-02-15 · before May 2024Influence 6/10 · AI estimate

The Minister said the DMRE had announced its intention to build a Liquefied Natural Gas complex in Coega.

“The DMRE announced that it intended to build a Liquefied Natural Gas complex in Coega.” Minister Gwede Mantashe. Mineral Resources, 2022-02-15
Interests and concerns (AI-drafted profile)

Interest: Mining and petroleum regulation. The Minister of Mineral and Petroleum Resources administers the Mineral and Petroleum Resources Development Act, the…

Concern: Not recorded.

Engagement path: Not recorded.

No statement on record (1)

AI-drafted from the actor's profile. Counted in no score.

NERSASupportNot countedInfluence 7/10 · AI estimate

No statement on this reform in the committee minutes on file. The position is AI-drafted from the actor's profile.

Interests and concerns (AI-drafted profile)

Interest: Statutory mandate as National Energy Regulator: licensing, tariff regulation for electricity, gas, and petroleum pipelines; consumer price protection…

Concern: Reform proposals that bypass NERSA licensing (e.g. registration-only frameworks for embedded generation) reduce statutory jurisdiction and create regu…

Engagement path: Regulatory reform must strengthen rather than hollow out NERSA's capacity; adequate resources and staff to handle an expanded regulatory workload unde…

OECD

Referenced in OECD Economic Surveys: South Africa

OECD SA Survey (2017, 2020, 2022, 2025). The 2025 survey calls for boosting public investment especially in electricity, water and rail.

The “gas cliff” refers to the expected decline in natural gas supply from Mozambique’s Pande and Temane fields by 2028. — Portfolio Committee on Electricity and Energy, media statement calling for urgency in addressing the gas cliff, 6 June 2025
Source

Implementation Roadmap

The live legislation is the Gas Bill [B6-2026], introduced in March 2026 by the Minister of Electricity and Energy, which would repeal the Gas Act, 2001 rather than amend it. The Portfolio Committee on Electricity and Energy concluded public hearings on 12 August 2026 and received the department's responses to submissions on 26 August 2026; Parliament's bill tracker still shows only the introduction stage as complete. South Africa still has no LNG import terminal: Vopak, which is to build and operate the Zululand Energy Terminal at Richards Bay with Transnet Pipelines, said in March 2026 that it had pushed its final investment decision back to 2028, citing uncertainty over Eskom's planned gas-fired plant at Richards Bay. The next steps would be for the committee to resolve the issues raised in hearings, including overlap with the Upstream Petroleum Resources Development Act and alignment with climate law, before the Bill, a section 76 bill, proceeds to the National Assembly and the NCOP.

1

DoneThe Gas Bill [B6-2026] was introduced in Parliament. Its stated purpose begins: to repeal the Gas Act, 2001, and to provide for the orderly development of the gas industry.

Introduced 5 March 2026 (bill page also lists 6 March 2026)Minister of Electricity and Energy

Source: parliament.gov.za

2

DoneThe Portfolio Committee on Electricity and Energy concluded public hearings. Industry sought regulatory certainty and raised overlap with the Upstream Petroleum Resources Development Act, 2024; environmental organisations asked for the Integrated Energy Plan to be completed first and for alignment with the Climate Change Act; organised labour supported the Bill.

Public hearings concluded 12 August 2026Portfolio Committee on Electricity and Energy

Source: parliament.gov.za

3

DoneThe committee received the Department of Electricity and Energy's responses to written submissions made during the hearings.

26 August 2026Portfolio Committee on Electricity and Energy / Department of Electricity and Energy

Source: allafrica.com

4

Under wayCommittee deliberations on the Bill and proposed amendments, before a report to the National Assembly.

Deliberations scheduled from 18 August 2026Portfolio Committee on Electricity and Energy

Source: parliament.gov.za

5

ProposedClarify in the Bill the boundary between gas regulation under the new Act and upstream petroleum regulation under the Upstream Petroleum Resources Development Act, and state how licensing decisions take account of the Climate Change Act.

Before the committee adopts its reportPortfolio Committee on Electricity and Energy / Department of Electricity and Energy
6

ProposedPublish the licensing rules and procedures needed under the new Act for import, regasification and distribution, so that terminal developers have a settled framework before final investment decisions.

Within 12 months of commencementNERSA (as gas regulator under the Act as enacted) / Minister of Electricity and Energy
Required Legislation

Gas Act 48 of 2001 (in force; administered by the Minister of Electricity and Energy since August 2024). Gas Bill [B6-2026] (introduced March 2026; before the Portfolio Committee on Electricity and Energy; would repeal the Gas Act, 2001). Related: Upstream Petroleum Resources Development Act, 2024, whose overlap with the Bill was raised in hearings.

Political Feasibility

In the August 2026 hearings industry and organised labour supported modernising the framework, while environmental organisations raised significant concerns. The Green Connection asked Parliament to withdraw the Bill, with advocacy lead Lisa Makaula stating that it makes no reference to the Climate Change Act, emissions targets or the just transition. In our judgement, the Bill's passage is likely to turn on how the committee handles these climate and land-rights objections and the overlap with upstream legislation, while LNG investment depends as much on Eskom's gas-to-power plans as on the Bill.

Evidence & Research

No linked research evidence yet. Coverage is incomplete.

Policy documents

No linked official-document evidence yet. Coverage is incomplete.

Get the Monday briefing by email

— A short weekly digest of what moved in SA policy.

Status History

tracked since Mar 2026
  1. Recorded as Partially implemented when status tracking began — held since at least Mar 2026.
    Mar 2026
  2. Moved from Partially implemented to Under review on 17 October 2026
    trigger

Data as of 2026-11-26 · latest PMG meeting 2026-11-20