Green Hydrogen R&D and Demonstration Programme

EnergyProposedMedium TermAI draft, partly checkedScience, Technology and Innovation

Theme: Green energy technology

First raisedSept 2025Last discussedSept 2025No committee discussion in 12+ months1 meeting on the record ↓

Reform at a glance

What changes
Green Hydrogen R&D and Demonstration Programme
Responsible actor (recorded)
Department of Science, Innovation and Technology / CSIR / HySA
Recorded status
Proposed — editorial assessment.
Milestone described by this status
Status scope has not yet been independently documented; it may cover only part of this reform.
Next documented milestone
Next milestone not yet documented
Compare shortlist (0/3)
Watch list (0)
Back to ideas

On the record

Raised in 1 committee meeting, Sept 2025. Full record

20252026Committee meetings · 116 September 2025: Science, Technology and Innovation: Hydrogen and Energy Collaborative Efforts between DSTI and DEE

Each dot is one event; events in the same month stack. Dots link to their source. Coverage is incomplete: an idea can have been discussed in meetings not yet linked here.

On this page

Description

AI draft, partly checkedThis idea's text is AI-drafted. Some of its claims have been checked against sources and corrected; the rest has not. Treat its figures as unverified unless a linked source confirms them. How idea text is checked

South Africa's Hydrogen Society Roadmap (2021) identified green hydrogen — produced via electrolysis using renewable electricity — as a strategic export opportunity and domestic decarbonisation tool, leveraging the country's exceptional solar and wind resources and PGM-based electrolyser catalyst reserves. The DSTI-led R&D and demonstration programme funds pilot electrolysis projects, green ammonia feasibility studies, and fuel cell bus deployments in partnership with the Industrial Development Corporation and CSIR. The Boegoebaai green hydrogen export hub in the Northern Cape is the flagship project, targeting export to European markets under the EU's RFNBO regulations. R&D funding has been allocated and Sasol completed a Boegoebaai pre-feasibility study in June 2026; commercial investment decisions depend on electrolyser cost trajectories, offtake agreements with EU importers, and Transnet port infrastructure development at Boegoebaai.

Assessment

Growth Impact4/5
Feasibility3/5

Ratings: AI-assigned, not reviewed. How they were made

Responsible: Department of Science, Innovation and Technology / CSIR / HySA

Feasibility Assessment

Long-term horizon. JET partners had allocated USD 462.9 million to 19 green hydrogen projects by 31 March 2026. R&D base (HySA, launched in 2008) is established. Key risk is electrolyser import dependency until local manufacturing develops.

AI-drafted. Its figures, dates, laws and named bodies have been checked against sources; its judgements have not been checked.

Published estimates

Figures published by the institutions named, not SA Policy Space projections. They measure different things over different periods and are not added up.

What the tags mean
Ex-post estimate
Estimated from data on what already happened, such as an evaluation of a past policy.
Model projection
A forecast or scenario from a model or a costed plan. Not an observed outcome.
Rough calculation
A simple calculation the source shows, such as a volume times a price.
Claim, no method
Stated by an official or interested party without a named study, model or method.
Official figure
An allocation, count or balance from budget, audit or programme records. Not an estimate of effect.

The tags were assigned by three AI models reading each estimate independently; no review of them by a person is recorded. The figure, its source and its caveat are the publisher’s.

Naming this reform

On the problem it addresses: Energy

These measure the cost of the whole constraint. They are not estimates of what this reform would gain.

  • Cost of the problem

    Ex-post estimate

    SARB models estimate that load-shedding reduced 2022 GDP growth by between 0.7 and 3.2 percentage points (other institutions' estimates range from 0.4 to 4.2 points).

    Cost of the electricity constraint that the energy reforms target (ERA Act, self-generation, Eskom restructuring, IRP, transmission); a cost of the constraint, not a modelled benefit of any reform.

    South African Reserve Bank (Janse van Rensburg and Morema) (2023): Reflections on load-shedding and potential GDP (Occasional Bulletin of Economic Notes OBEN/23/01)

    An Occasional Bulletin of Economic Notes: 'The views expressed ... are those of the author(s) and should not be attributed to the South African Reserve Bank or South African Reserve Bank policy.' The low end (0.7, SARB Model 1, direct sectoral effect, the figure SARB's April 2023 Monetary Policy Review also cites: 'load-shedding alone shaved off 0.7 percentage points from growth in 2022') and the high end (3.2, dynamic CGE with indirect effects) differ mainly on indirect effects; private estimates in the same note range from 0.2-0.4 (Investec, after backup power) to 3.5-4.2 (PwC), and Section 5.2 of the note gives a different SARB range (-1.2 to -3.0) that the note does not reconcile.

  • Cost of the problem

    Ex-post estimate

    A SARB Quarterly Bulletin box estimated that load-shedding likely lowered quarterly (not annualised) real GDP growth in the third quarter of 2022 by 2.1 percentage points (unadjusted intensity index), or 2.3 points with the adjusted index.

    Cost of the electricity constraint (same reforms as above); a single quarter.

    South African Reserve Bank (2022): Quarterly Bulletin December 2022, Box 1: Measures of electricity load-shedding

    The box says 'the results are merely indicative and should be interpreted as such' and the estimated frameworks 'are not exhaustive' (no control for changes in electricity demand). A regression of quarterly GDP growth on a load-shedding intensity index (about 0.0014 percentage points per GWh shed, adjusted index); one quarter only, and not comparable with the annual figures.

  • Cost of the problem

    Model projection

    The SARB's MPC estimated in January 2023 that load-shedding deducts as much as 2 percentage points from growth in 2023, compared with a previous estimate of 0.6 percentage points.

    Cost of the electricity constraint (energy reforms in this package).

    South African Reserve Bank (Monetary Policy Committee) (2023): Statement of the Monetary Policy Committee, January 2023

    A forecast assumption, not an outturn; the January 2024 MPC statement notes 'The cost per stage was revised lower in the March 2023 MPC meeting', and the OECD later reports 1.5 points for 2023.

  • Cost of the problem

    Model projection

    The OECD reports that electricity shortages were estimated to reduce GDP growth by 1.5 percentage points in 2023, 0.5 points in 2024 and 0.2 points for 2025, citing the SARB (2024).

    Cost of the electricity constraint (energy reforms in this package).

    OECD (citing SARB, 2024) (2025): OECD Economic Surveys: South Africa 2025

    Secondary citation: the OECD's Ecoscope blog attributes this to SARB's October 2024 Monetary Policy Review, but that MPR (fetched) gives no 2023 figure and reports April 2024 projections of '0.6, 0.2 and 0.04 percentage point deductions' and only 0.1 point for 2024, so the 2024-25 figures here disagree with SARB's own later numbers.

  • Cost of the problem

    Model projection

    SARB's January 2024 MPC statement put the nominal cost to GDP of load-shedding at R0-R1.2 million per stage-day for stages 1 and 2 and up to R204-R899 million for stages 3 to 6, when continued on a 24-hour basis on weekdays.

    Cost of the electricity constraint (energy reforms in this package).

    South African Reserve Bank (Monetary Policy Committee) (2024): Statement of the Monetary Policy Committee, January 2024 (footnote 3)

    A forecasting input ('the cost to GDP per stage-day'), revised lower in March 2023 and 'assessed further as new data and information is received'; the SARB OBEN note cites Intellidex at about R125 million per stage per day on average.

All published estimates for this reform package

Who is on record

Every position on this reform: whose word it is, when it was said, and any terms attached.

Backers

0

0 actors on record

Conditional

0

0 actors on record

Opposition

0

0 actors on record

No stance below is the actor's own word on record, so none is counted (1 MP's remark in committee, 2 with no statement on record).

Coalition Read

No stance on record

0 of 56 actors on record — not scored

A coalition score needs at least 3 stances on record in the actor's own words. The stances below are the evidence; the average over this few of them would not be.

Political Tractability

—Needs reviewed signals

No reviewed signals · 0% of mapped influence has been reviewed.

MPs' remarks in committee (1)

A party member speaking in committee, not the party. Counted in no score.

uMkhonto weSizwe Party (MK)OpposeMP's remarkFrom the minutes · AI-read2025-09-16Influence 5/10 · AI estimate

An MK member questioned investing time and resources in hydrogen research, which he regarded as years from practical application, instead of proven deployable technologies.

“Mr A Nchabeleng (MKP) questioned the focus on developing a hydrogen economy in South Africa, given the current lack of commercially viable hydrogen technology. He expressed concern that significant time and resources were being invested in hydrogen research, which he regarded as still years away from practical application, instead of concentrating on proven, deployable energy technologies.” Mr A Nchabeleng (MKP), speaking as a member. Science, Technology and Innovation, 2025-09-16
Interests and concerns (AI-drafted profile)

Interest: Keeping Transnet's freight rail business whole and in state hands; in October 2024 it rejected the split of Transnet Freight Rail into two operating d…

Concern: What it calls the privatisation of freight rail, passenger rail and ports under Cabinet's Rail Private Sector Participation Framework (October 2024).

Engagement path: Not recorded.

Outside the actor map (1)

Other bodies heard in committee. AI-read, unreviewed, and counted in no score or lead.

Department of Science, Technology and Innovation (DSTI)SupportSponsoring department2026-03-17Government

The DSTI reported that it was positioning South Africa as a global green hydrogen hub.

“Hydrogen and Energy: The Department was positioning South Africa as a global green hydrogen hub.” Department of Science, Technology and Innovation (DSTI). Science, Technology and Innovation, 2026-03-17
“Ms Mlilo said hydrogen was a national priority for South Africa, aiming to boost economic development and reduce emissions.” Department of Science, Technology and Innovation (DSTI). Science, Technology and Innovation, 2025-09-16
No statement on record (2)

AI-drafted from the actor's profile. Counted in no score.

Presidency / Operation VulindlelaSupportNot countedInfluence 10/10 · AI estimate

No statement on this reform in the committee minutes on file. The position is AI-drafted from the actor's profile.

Interests and concerns (AI-drafted profile)

Interest: Cross-cutting structural reform coordination across energy, logistics, water, digital infrastructure, and visa reform. Operation Vulindlela, establish…

Concern: Implementation bottlenecks within line departments; regulatory capture of NERSA and ICASA; SOE institutional inertia; ensuring quick wins translate in…

Engagement path: Already fully engaged. Seeks line department buy-in, NEDLAC social compact legitimacy, and international DFI financing alignment on key reform milesto…

DTIC (Dept. of Trade, Industry & Competition)SupportNot countedInfluence 7/10 · AI estimate

No statement on this reform in the committee minutes on file. The position is AI-drafted from the actor's profile.

Interests and concerns (AI-drafted profile)

Interest: Industrial policy objectives — local content requirements, beneficiation, BBBEE transformation, SEZ development, and protection of manufacturing emplo…

Concern: Full logistics liberalisation without local content protections could hollow out domestic manufacturing by reducing input costs asymmetrically for ext…

Engagement path: Logistics and energy reforms include localisation provisions and domestic content requirements; trade agreements include industrial policy safeguards;…

OECD

Referenced in OECD Economic Surveys: South Africa

OECD SA Survey (2017, 2020, 2022, 2025). The 2025 survey calls for boosting public investment especially in electricity, water and rail.

Evidence & Research

Research corpus →

Matched to this reform by an automated relevance check. Follow the paper for the full argument and its caveats.

Policy documents

No linked official-document evidence yet. Coverage is incomplete.

Parliamentary record

1 meeting

Committee sittings this reform was drawn from, most recent first. Each row opens the meeting on this site; the PMG link goes to the source record.

Get the Monday briefing by email

— A short weekly digest of what moved in SA policy.

Status History

tracked since Mar 2026
  1. Recorded as Proposed when status tracking began — held since at least Mar 2026.
    Mar 2026

Data as of 2026-11-26 · latest PMG meeting 2026-11-20